Oil Wellheads & Flow-lines
| Examination Details |
| Duration |
2 days |
| Skill Level Required |
None |
| Brief Description |
The delegate will be able to describe a typical wellhead, the surface control and production equipment and essential operating requirements.
|
| Course Objectives |
| At the end of the course delegates, |
| Should be able to:
|
- Describe a typical wellhead and Xmas tree
- Describe surface control and production equipment
- Describe the instrumentation and corrosion monitoring equipment
- Describe Emergency equipment provided
- Describe the condition monitoring required to optimize the operation of the plant and equipment
|
| Topics
|
- Sub surface safety valve
- Well head layout
- Xmas tree and valves
- Tubing and casing kill system
- Well control system
- Choke valve
- Gas lift
- Production manifolds
- Instrumentation and corrosion monitoring
- Sand detection devices
- Critical situation actions
- Closed in Tubing Head Pressure & Flowing Tubing Head Pressure
- General startup and shutdown procedures
- Checks required to optimize the operation of the plant and equipment
|
|
Method of Assessment
|
- Course Assessment(Via OCS Evaluation Sheet)
- Continuous Assessment
- Theory Test
- Practical Test
- Assessment Via Examination
|
| Type of Certificate |
- OCS Attendance
- OCS Satisfactorily Completed
- OCS Certificate of Achievement
|
| NB: |
- 1 and 2 days course will need to be combined together totaling a minimum of 3 days
|
OCS Training Institute © 2011 All rights Reserved